SURFACE PREPARATION:
All surfaces should be clean, dry and free from oil or grease, dust, dirt, loose paint or other foreign matter prior to application. Repair all cracks and blisters. New BUR asphalt roof surfaces should weather a minimum of 180 days before being coated with 28 Non-Fibered Perfectseal Aluminum Roof Coating. However, 28 Non-Fibered Perfectseal Aluminum Coating can be coated on roofs 3 to 5 days after KARNAK asphalt emulsions have been applied. Badly weathered or alligatored asphalt surfaces should be primed with 100 Non-Fibered Emulsion or 220 Fibered Emulsion prior to coating with 28 Non-Fibered Aluminum Coating. Allow emulsion primer to cure a minimum of 3-5 days before application of aluminum coating.
APPLICATION:
28 Non-Fibered Perfectseal Aluminum Roof Coating should be spread uniformly over the roof surface. Care should be taken not to overwork the coating
during application. This could have a damaging effect on the leafing of the aluminum. Pour the correct amount of aluminum coating to cover a given area and
apply uniformly. Be sure to mechanically mix the aluminum coating thoroughly before using. KARNAK 28 Non-Fibered Perfectseal Aluminum Coating can be applied with a soft roof
brush, roller or spray.
COVERAGE RATE:
Apply at 0.5 to 1 gallon per 100 sq. ft. DO NOT THIN.
CAUTION:
Do not use near open flame. Avoid breathing solvent fumes and prolonged contact with skin. Do not take internally. If swallowed, do not induce vomiting. Call a physician immediately. Keep out of reach of children. Store in a heated room and keep container covered when not in use. Do not thin. Dispose of in an environmentally safe manner. Cover air intakes during application and while drying. Exterior use only.
KARNAK recommends coating torch-applied modified bitumen membranes as soon as possible after the membrane is installed. KARNAK’s experience, laboratory and field tests, as well as NRCA, RCMA and ARMA reports, indicate that aluminum roof coating will reduce the combined effects of ultra violet rays,heat and moisture, which, especially on APP modified bitumen, enhance exudation that can cause discoloring and delamination of any surface coating. After 60 days, recommended application temperatures are 50˚F and rising. Coating must not come in contact with any type of moisture within 24-48 hours after application. Cold-process systems and coatings, either emulsion or solvent-based, should only be installed on decks with positive drainage. Per NRCA (National Roofing Contractors Association), “The criteria for judging proper slope for drainage is that there be no evidence of standing water on a deck 48 hours after it stops raining